물 자연 그리고 사람 - 물로 더 행복한 세상을 만들어가겠습니다.
HOMER&D성과논문실적

논문실적

A study on the reconstruction model for minimizing water supply riskin existing water distribution network 게시글의 제목, 학술지명, 저자, 발행일, 작성내용을 보여줌
A study on the reconstruction model for minimizing water supply riskin existing water distribution network
학술지명 Desalination and Water Treatment 저자 최두용,최태호,구자용,김기범
발표일 2019-03-31

This study details the development of a reconstruction model for reducing water supply risk (WSR)in an existing water distribution network (WDN). This development included additional gate valvesfor reducing the impact of a burst pipe (ImpPB), additional emergency pipes for adjacency block,and pipe replacement to reduce the probability of a burst pipe (ProbPB). The developed model wasapplied to the study area, giving a block WSR in the reconstructed network of 0.471 m3/year, with apossible input budget of about KRW 140 million (4.5% of the maximum cost for reconstruction);1,000 KRW = 0.92 USD = 0.69 EUR, 31 Dec 2012. This constituted a decrease of block WSR by 68.7%compared with that of the existing pipe network. The benefit cost for WSR reduction was defined asshown in Scenarios 1?4 at respective ratios of KRW 40,000/m3, KRW 60,000/m3, KRW 80,000/m3, andKRW 100,000/m3. Results show that higher the benefits of reducing the WSR in existing WDNs, more thechance for WSR reduction. On the other hand, if the benefit cost for WSR reduction is low, this indicatesthat it is not possible to actively reduce WSR. In other words, it is currently difficult to accurately convertthe benefits of reduced WSRs. However, if such problems are solved in the future, it should be possibleto establish more accurate budgets and plans can for minimizing WSR in existing WDNs.

목록