| 열역학법 효율시험을 활용한 50MW급 수력현대화 평가 |
|---|
|
학술지명 한국유체기계학회
저자 조용,배강호,고성호,조태영
발표일 2021-12-01
|
|
This study modernizes the runner of a Hapcheon hydropower plant installed with a vertical Francis turbine with a rated headof 95 m, measures and compares the field efficiency before and after the modernization, and verifies how much influence therunner has on the efficiency of the turbine. The same field test was performed using the thermodynamic method, which is atest applicable to turbines exceeding 100 m head according to IEC 60041. Efficiency of the old runner was measured at 93.21%as the highest efficiency point under the condition of head 113.0 m. Efficiency of the new runner was measured at a highestefficiency of 94.20% despite the worse condition of head 115.75 m. The efficiency improved by about 1%p under the operatingconditions above about 50% turbine power output. It is meaningful in that the performance of HPP is improved by replacingthe runner. |